All interior concrete floors are now polished.  This is done in 8 steps.  The floors are beautiful!

Bedroom closets and hallways closets have been built.  Also done some odd/ends regarding IKEA

Everything has been painted inside ready for final coat.  The final coat will be applied the day before C.O.

Shower details and shower doors are completed.  Mirrors are ready to install.  Monday.

Bath shower walls for Hannah/Olivia has been installed.

Pool has been poured.  On the far end a room will be built where all equipment will be hid inside.

Mosaic for the hot tub.  They will start on Mosaic on Monday.

Down spouts are being installed. The final roof details are being wrapped up this coming week.

Caulking has been done.  The color of the caulk is matching the window colors.

The IPA has been oiled.  This looks AMAZING!

Downstairs patios and part driveway has been poured.  This is critical to stop mud from stucco.

The other side of the downstairs patio.

The motorized screens for the porch has been installed.  You can hardly see them, that’s the point.

We had our first Fiesta on the downstairs patio.  Mexican Carne Asada. Nice break to the day.

Railings on all outside decks are finished. The master balcony can now be tiled.